Building "off-grid"

- SubFloor Installation -
(click pictures for larger view)

Late July 2005:  As you can see from the pile of lumber they dropped off, a big chunk of this phase was manual labor.  First I had to get the subfloor sheets on top of the structure, which I decided to do on the very hot, humid afternoon they were delivered.  Warning:  Despite the large quantity if water I drank that evening, I was a little headachy and nauseus with heat sickness by the time I finished.  The moral of the story:  Water alone doesn't cut it.  Gatorade is the key.

The next day, before starting to actually fasten down the flooring, I bought 2 gallons of Gatorade.  It was even hotter and more humid that day, so I drank almost all of it by late afternoon.  Also, by late afternoon, I realized that one person simply can't lay 'tongue-in-groove' flooring by himself.  I ended up hiring a local contractor to come help me with the bulk of the flooring, and they did a fantastic job.  I felt a little bad about "copping out", but there are simply some jobs that require help and/or professionals.  No shame in that, I guess.  Oh, and along with the subfloor, glue, nails, etc., I bought some plywood to finish off the front and rear faces of the structure and some 2x4 studs for I-joist bracing, etc.

Cost:  50 sheets of OSB "TNG" subfloor ($1000), a dozen sheets of plywood ($160), 50 2x4 studs ($120) 16 tubes of subfloor glue ($50), glue gun ($10), air-nailer rental ($25), stitch nails ($30), air compressor rental ($46), contract labor ($450)

Lumber Pile!                                 View from SE

Click for larger view

Click for larger view

View from SW                                        View from NW

Click for larger view

Click for larger view


Previous Series     Series Headings List     Next Series