| Earth berm bracing Bracing the block walls was necessary to prevent a cave-in from the pressure of all that fill dirt.  Once the floor trusses are in place, the walls will be able to handle the rest of the fill.
 | |
|   | |
| Back | |
| Copyright © 2002- Wright Track Enterprises, Inc. All rights reserved. | |